2023 "TPP Maritsa East 2" EAD - Turbine department
2022 "AES-3C Maritsa East 1" EOOD - EN 14181
2022 "AES-3C Maritsa East 1" EOOD - Periodic measurements
2021 ContourGlobal Maritsa East 3 - FGD Test and EN 14181
2019 "TPP Maritsa East 2" EAD - Department "Environmental protection" BAT
2019 "TPP Maritsa East 2" EAD - CPS and burners refurbishment of Boiler 9
2019 "TPP Maritsa East 2" EAD - Department "Environmental protection"
2019 "TPP Maritsa East 2" EAD - EN 14181
2016 "TPP Maritsa East 2" EAD - Refurbishment of boilers 7 and 8
2016 "TPP Maritsa East 2" EAD - Detail design for refurbishment of FGD 7 and 8
2016 "Totema" EOOD - CFD study of boilers 9 and 10
2016 TPP ContourGlobal Maritsa East 3
2015 Steinmüller Engineering GmbH - Unit 1
2014 Steinmüller Engineering GmbH - Unit 2
2013 Steinmüller Engineering GmbH - Unit 4
2013 "AES-3С Maritsa East 1" EOOD - EN 14181
2013 "TPP ContourGlobal Maritsa East 3" AD - EN 14181
2012 Consortium IDRECO-INSIGMA - Garantee and operation parameters of FGD 5 and 6
2012 "AES-3С Maritsa East 1" EOOD
2009 Е&Z Industrie-Losungen GmbH